|
|
DONE DEAL'S EQUIPMENT Done Deal is a 1998 Catalina 380 Sailed on SF Bay |
|
Sink Boards These are cut to sit on top of the sink, virtually flush to the counter tops. I traced the profile and had TAP Plastics cut the pieces. I cut the port side longer so that it overlaps the center divider. See dehumidifier below.
|
![]() |
We place a dehumidifier on the boards; with a hole drilled in the reservoir the water drains off cutting board into the sink.
